Tuesday, May 3, 2011

Day 276



Evened out all openings for tanks in fish room. Hung all outlet, switch, and light boxes. Started drywall on fishroom, around 388gal. Going to hand wire next. I have one copper pipe that sweats from the humidity in the summer, painting the pipe with pick-up truck bed liner. Maybe this will insulate it and stop it from dripping.
Blackbelt Vieja was moved from sump to tank #16, so far so good. Burned out a AC70 on tank #19, will replace. Did 25% water change and prefilter change in 380gal.(#13). All else good.

No comments:

Post a Comment